Civic-EP2.co.uk
May 28, 2012, 09:32:08 PM *
Welcome, Guest. Please login or register.
Did you miss your activation email?

Login with username, password and session length
News: SMF version updated
Any issues with deleted accounts please let me know.
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Bargain bodykit  (Read 1568 times)
Halfloaf
Administrator
Expert
*****

Karma: 5
Posts: 913



View Profile
« on: November 22, 2005, 08:06:12 PM »

This is the cheapest bodykit I've seen in the uk.
£225 plus £40 P&P

Buddy club Clone Front bumper, Rear bumper and sideskirts

http://cgi.ebay.co.uk/Honda-Civic-3Dr-Hatch-Bodykit-01-03_W0QQitemZ4591024774QQcategoryZ10386QQcmdZViewItem

Item number 4591024774

Ebay Shop GXAutoDesign
Logged

JDMEp2
Expert
***

Karma: 0
Posts: 1049



View Profile
« Reply #1 on: November 22, 2005, 08:10:58 PM »

nice, i bet you would have trouble with fitting it though?
Logged

lt;a href="http://photobucket.com/" target="_blank"><img src="http://i10.photobucket.com/albums/a121/JDMEp2/untitled.jpg" border="0" alt="Photobucket - Video and Image Hosting"></a>
Civic_Vtec
Global Moderator
Expert
*****

Karma: 0
Posts: 1144



View Profile
« Reply #2 on: November 22, 2005, 08:14:53 PM »

Buddyclub clone is a replica i take it? The buddlyclub is a goodlooking kit but im not sure on the rear.
Logged

1999-MB6
2005-EV1
2001-EP2
Halfloaf
Administrator
Expert
*****

Karma: 5
Posts: 913



View Profile
« Reply #3 on: November 22, 2005, 08:27:30 PM »

I'm not sure what kit it is 'Buddy Club Clone' was just my take on describing it. It looks like the one tss-tuning.de sell
Logged

sumba
Global Moderator
Expert
*****

Karma: 0
Posts: 819



View Profile WWW
« Reply #4 on: November 23, 2005, 12:09:31 AM »

bargin price tht is!! Dynax probably be interesting!!
Logged

img]http://i23.photobucket.com/albums/b398/sumba/tofu.jpg[/img]
Dynax
Expert
***

Karma: 2
Posts: 979



View Profile WWW
« Reply #5 on: November 23, 2005, 12:48:21 PM »

Nope, i like my mugen one ta  Tongue
Logged
JDMEp2
Expert
***

Karma: 0
Posts: 1049



View Profile
« Reply #6 on: November 23, 2005, 12:58:13 PM »

Cheesy
Logged

lt;a href="http://photobucket.com/" target="_blank"><img src="http://i10.photobucket.com/albums/a121/JDMEp2/untitled.jpg" border="0" alt="Photobucket - Video and Image Hosting"></a>
jamieg
Senior
**

Karma: 0
Posts: 316


View Profile WWW
« Reply #7 on: November 23, 2005, 02:43:29 PM »

I dont go for replicas, especially ones this cheap. From what I hear, most people end up paying more to get it modified so it fits properly, wouldnt want it cracking with the slightest stone either.
Logged

ww.jtuned.com
Civic_Vtec
Global Moderator
Expert
*****

Karma: 0
Posts: 1144



View Profile
« Reply #8 on: November 23, 2005, 02:48:13 PM »

Possibly but in the case of the spoiler we have to go for the replica one, btw where did you get your spoiler from jamie?
Logged

1999-MB6
2005-EV1
2001-EP2
jamieg
Senior
**

Karma: 0
Posts: 316


View Profile WWW
« Reply #9 on: November 23, 2005, 02:55:20 PM »

Mine was genuine type-r. It does fit lol... despite what chrisdicko says. He just doesnt like the half a centimetre gap coz of our different tail gates from the R.
Logged

ww.jtuned.com
Dynax
Expert
***

Karma: 2
Posts: 979



View Profile WWW
« Reply #10 on: November 23, 2005, 03:29:05 PM »

My ep1 has a genuine type-r spoiler, and it fits  Tongue Told you all this before though Cheesy Just shave some of the mounting posts down
Logged
chrisdicko
Global Moderator
Expert
*****

Karma: -1
Posts: 1615



View Profile WWW
« Reply #11 on: November 23, 2005, 06:30:27 PM »

Yeah, it bolts on etc......but doesnt really fit! Or Honda wouldnt bring out another one would they to fit ours??!! The gap was noticable, far much for my liking!!
Logged

img]http://i16.photobucket.com/albums/b31/chrisdicko/hard.gif[/img]
qdfsnjy5bhh
Junior
**

Karma: 0
Posts: 160


View Profile
« Reply #12 on: March 03, 2012, 01:15:33 PM »

[Editor: Anonymous]
October 25, Wujiang City Pingwang town. security
 
 Wujiang Oasis Green Electric Power Company Limited is reinforced factory door. Beijing-Hangzhou Grand Canal is flowing in the plant at the foot of the river on board to ship to.
 
 Wujiang City, decided to cease this waste incineration power plant. The plant had originally planned ignition of the test operation in 21.
 
 cessation of opposition from surrounding residents due to the power plant under construction. My family behind in the power plant, plastic burning of refuse out of the smoke dioxins, carcinogenic, we do not build power plants, more than 50-year-old level Nishimura villagers Xiuying (a pseudonym).
 
 plant follow-up how to deal with business and government are in intense thought. Power plant investor markets in the East (000,301) (000301.SZ), Deputy General Manager Gao Jian told reporters: waste incineration power generation projects have stopped construction, the construction team full withdrawal, but use of the disposal of assets, also requires a process and procedures, the city is still under study, after all, the decision to suspend construction on October 24. br> Ministry of Environmental Protection Secretary for EIA, an official said, In general, waste incineration power plant is supported, because the amount of waste is too great, especially in the east can not find the local landfill, but also depends on the specific to local circumstances.
 
 Shanghai, for example, per person per day to produce one kilogram of waste, 20 million population is 20 million kilograms of garbage does not have enough landfill point. the
 
 
 
 
 
 dioxin including 210 kinds of compounds, it is difficult to natural degradation of toxic,A better tomorrow
Industry and Information Technology Ministry has concentrated announce electronic information manufacturing industry planning of planning., which is 130 times that of cyanide, arsenic 900 times.
 
 Wujiang City waste incineration power plant project environmental impact assessment report, the project is expected to total investment of 320.01 million yuan,burberry, of which environmental protection investment 50 million yuan, accounting for 15.6% of the total investment. The report set the incineration plant health protection zone of 300 meters, said it would start to reduce the dioxin generated from the control source, reduce the formation of the furnace, to avoid the three aspects of the furnace outside the low-temperature synthesis.
 
 Environmental Protection Department of the EIA Secretary an official explained that the national provisions of 300 meters is the minimum distance of the protective. Specific protection from a series of equations,louboutin pas cher, the model calculations also take parameters, we must consider the weather conditions, temperature, humidity, wind speed, calculated that less than 300 by 300 operator, greater than 300, according to the larger number operator. the
 
 In addition, he said The The dioxin countries national standards 1.0TEQng/m3,louboutin, EIA Division approval criteria 0.1TEQng/m3 EU standards 10 times more stringent than the national standard, insurance.
 
 As for the process, in which the flue gas purification intend to use lime semidry deacidification + activated carbon injection + bag filter series. The bottom discharge of waste incineration residues Sinotrans comprehensive utilization of fly ash after curing a secure landfill.
 
 the Ministry of Environmental Protection officials said,
 
 equipment and methods are not more advanced, if the strict control of the production process, dioxin emissions will not exceed the standard senior engineer to do the same, said.
 
 However, he revealed that a number of waste incineration plants is indeed excessive dioxin, for example, may reach 0.14TEQng/m3.
 
 the dioxin unable to online monitoring
 
 a doubt, even if the project approval procedures, protective enough distance, who will ensure strict enforcement of environmental standards in the production process? Ministry of Environmental Protection
 
 officials said that the international dioxin can not be achieved online monitoring. But there will be some indirect means, such as activated carbon inputs to calculate the dioxin emissions, in addition to spot checks. the
 
 state regulations, the trial run for six months after acceptance, five years later, retrospective acceptance Jiangsu Department of Environmental Protection officials said. However, he said, the dioxin monitoring a simple way to the entrance of the garbage power plant must have a display,basket jordan, as long as the furnace temperature is not lower than 850 degrees Celsius, there would be no dioxins generated. > Zhang Yuan Zhao, a researcher of the Chinese Institute of Environmental Sciences is the anti-burning camp.
 
 his analysis, the project's main source of pollution is the burning furnace, instead of the waste repository and the sewage treatment station For the purposes of the incinerator, should be considered in the environmental protection zone, rather than the health protection zone. abroad of
 
 and does not require the distance of the specific waste incinerators, in accordance with the process method, the amount of waste disposal, garbage classification, as well as weather conditions, and determination of a safe distance from the model calculation method.
 
 Ministry of Environmental Protection officials respond, some protective distance, they do not have the protection zone
 
 It is worth noting that Japan's waste classification rate is far higher than China, and thus the incinerator and not too much combustion dioxin substances, such as plastics, industrial waste. If the project EIA to demonstrate full the public participate in
 
 the
 
 in the EIA process, or relocation, or to improve the protection zone, not have been stopped in the ignition key moment.
 
 Ministry of Environmental Protection officials recalled, from the EIA report in writing has really done a notary involved in the process, but there are also sample the participation rate, can not ask everyone being investigated.
 
 Jiangsu Department of Environmental Protection officials also said that by the provisions of the EIA unit to do about 100 copies of the questionnaire to solicit the views of nearby residents.
 
 and medium-sized construction project environmental assessment process, project organization commissioned EIA agencies to carry out environmental impact assessment, EIA agencies to complete the report (draft) in local publicity, and then randomly selected experts from the Ministry of Environmental Protection National Center for Environmental Assessment assessment.
 
 As for the hearing, the above engineers said,
 
 
 
 3 billion investment who pays the bill?
 
 registered capital of 70 million, on account of the use of funds more than 20 million project has a construction budget of 320.01 million yuan stands Canal, east side, more than 200 million of funds from bank loans.
 
 
 
 Wujiang Municipal Propaganda Department official said that the consultation is whether the transfer of business equipment can, try to recoup their losses.
 
 Gao Jian, the project as early as November 2006, from Jiangsu Province Development and Reform Commission approved project environmental impact report by environmental experts from the Ministry of assessment in November 2006 and March 2007 in Wujiang site a week-long publicity.
 
 in November 2007. after, in order to avoid the stock price volatility, the company has to communicate with the top 10 shareholders, and hope they will not sell,moncler, it now appears fairly stable share price. its introduction,franklin marshall, the % interest rate loans have a project as collateral. enterprise in the form of BOO (construction,流浪者歌
Industry and Information Technology Ministry has concentrated announce electronic information manufacturing industry planning of planning., own, operate) for a period of 30 years.
 
 the theoretical value of a project is processing 700 tons of garbage, tons of power generation theory value of 200-250 kWh of electricity, the machine a year to overhaul the month.
 
 Internet tariff on government subsidies coupled with the system purchase price of 0.67 yuan per kWh (including tax) deduction dutiable at 0.57 yuan per kWh. In addition, corporate income, including waste disposal per tonne of government subsidy of 95 yuan.
 
 In fact, the incineration plant can not leave the government subsidies, waste incineration power plant often can not get enough junk, rubbish quality can not be achieved theoretical thermal value. said
 
 Gao Jian, in full accordance with 700 tons daily in sufficient quantities to calculate the power generation of 200-250 degrees, then the garbage power plant annual rate of return of 8% to 10% (
Logged
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.8 | SMF © 2006-2008, Simple Machines LLC Valid XHTML 1.0! Valid CSS!